Fence post concrete
How many bags of concrete your fence posts need, with the right hole size and depth.
How we worked it out
- Hole width: 3 × 4 in post width = 12 in (Quikrete's rule)
- Hole depth: 8 ft × 12 ÷ 3 + 6 in gravel = 38 in (Quikrete's rule), so 32 in of concrete above the gravel
- Concrete per hole: (π × (12 in ÷ 2)² − 3.5 in × 3.5 in) × 32 in ÷ 1,728 = 1.87 ft³
- 1.87 ft³ × 10 posts + 10% extra = 20.5 ft³
- 20.5 ft³ ÷ 0.375 ft³ per 50 lb bag = 55 bags (rounded up)
- Gravel: π × (12 in ÷ 2)² × 6 in × 10 posts ÷ 1,728 = 3.9 ft³
The working shows here once your sizes are filled in.
Everything else this job needs
- Bags 55 × 50 lb fast-setting
- Gravel for the hole bottoms·6 inches in each hole·often forgotten 3.9 ft³
Live drawingDraft copy
cross-section of the hole with gravel, concrete and post.
Setting steps from QuikreteDraft copy
(gravel, dry-pour fast-setting, about 1 gallon water per 50 pound bag, sets in 20-40 minutes, wait 4 hours before heavy loads).
Worked examples
Ten 4x4 posts, 8 feet long, 50 pound fast-setting
Number of posts 10·Post size 4x4 wood·Post length 8 ft·Bag type 50 lb fast-setting·Extra for waste and spills 10%·Hole width 0 in·Hole depth 0 in
Buy 55 bags for 10 posts: holes 12 inches wide and 38 inches deep.
- Bags to buy
- 55
- Concrete per post
- 1.87
- Hole width
- 12.0 in
- Hole depth (with 6 inches of gravel)
- 38.0 in
- Gravel for all holes
- 3.9 ft³
Matches Quikrete's example: 4 inch round post, 10 inch hole, 24 inches deep
Number of posts 1·Post size 4 in round·Post length 6 ft·Bag type 50 lb fast-setting·Extra for waste and spills None·Hole width 10 in·Hole depth 24 in
Buy 2 bags for 1 post: holes 10 inches wide and 24 inches deep.
- Bags to buy
- 2
- Concrete per post
- 0.69
- Hole width
- 10.0 in
- Hole depth (with 6 inches of gravel)
- 24.0 in
- Gravel for all holes
- 0.3 ft³
Method and sources
Each calculator uses the standard formula and the manufacturer's own figures, such as bag yields, and rounds up where running short would cost you a trip. Every step is shown. Cost ranges come from named surveys with the date we checked them. Spot something wrong? Tell us and we will fix it and note the change.
- Hole width 3x the post's nominal width; depth one-third of post length plus 6 inches of gravel (Quikrete).
- Concrete fills from the gravel to ground level; the post's own space is taken off.
- Wood posts use dry dressed sizes (4x4 = 3.5 inches, 6x6 = 5.5 inches, NIST PS 20); green posts are slightly larger.
- Bag counts are rounded up to whole bags.
- Check your local frost line and building code; they can require deeper holes.